UJENZI COLLEGE / PRACTICAL LEARNING

How to Prepare a Basic Painting Quotation in Kenya

Paint brushes and a roller beside a wooden crate and paint tray

A painting quotation in Kenya should tell the client what will be painted, how the surfaces will be prepared, which products are proposed and how the price has been calculated. An itemised quotation is easier to compare and manage than a single unexplained total.

The example below is a training exercise. All prices, dimensions, coverage assumptions and allowances are illustrative, not current market rates or a quotation for an actual room.

Define the scope before measuring

Identify the property and room, then state whether you are quoting walls, ceilings, doors, frames or other surfaces. Record the condition observed and the preparation included. Agree whether furniture moving, access equipment, protection and cleanup are part of your work.

State the proposed product, colour reference, finish and coating system. If a sample must be approved, include that step. Unknown dampness, failed coatings or other unresolved conditions should be assessed before promising a complete price for their treatment.

Calculate the paintable area

For a simple rectangular practice room measuring 4 m by 3 m with a wall height of 2.7 m, the perimeter is 14 m. The gross wall area is 14 × 2.7 = 37.8 m². If agreed door and window deductions total 5.8 m², the net wall area is 32 m².

Measure and describe ceilings or timber separately. Real rooms may have returns, recesses and other details that need their own measurement. Record your method so another person can follow it.

Estimate quantity using the actual product

For this exercise, assume two topcoats and a planning coverage of 10 m² per litre per coat. The calculation is 32 × 2 ÷ 10 = 6.4 litres. An illustrative 10% allowance gives 7.04 litres; pack sizes then affect the purchase quantity.

This example assumes two 4-litre packs. Check the actual manufacturer coverage and site conditions before purchasing. Preparation products and primer, if required by the system, need separate quantity calculations. Crown’s Silk Vinyl information notes that spreading capacity depends on factors including the surface and application.

Build an itemised cost table

Illustrative itemCalculationAmount
Topcoat paint2 packs × KES 3,000KES 6,000
Preparation materialsAssumed allowanceKES 1,500
Protection and consumablesAssumed allowanceKES 800
LabourAssumed task priceKES 6,000
DeliveryAssumed costKES 700
Cleanup and waste handlingAssumed costKES 500
Illustrative subtotalBefore any applicable taxKES 15,500

Replace every assumption with the actual scope and confirmed prices. State VAT separately where applicable and make the final payable total clear. Do not treat this sample subtotal as a recommended charge.

Add terms that prevent confusion

  • Quotation date, reference and validity period.
  • Included preparation and the agreed finish system.
  • Access, working arrangements and responsibilities.
  • Proposed programme, subject to conditions and product drying requirements.
  • Payment stages and approval process.
  • Exclusions and how variations will be agreed in writing.

Before submitting, check arithmetic, quantities, product availability and whether anything appears twice. Discuss uncertainty openly rather than hiding it inside a vague price.

Ujenzi’s Painting and Decorative Finishes course includes a basic quotation exercise alongside practical samples. Ask about the next three-week class.

Photography is illustrative; stock images do not depict Ujenzi learners, staff or facilities.

← Explore all learning guides

Build a practical skill.

Explore focused short courses in interior design, gypsum, painting, fit-out planning, software and AI.

Ask about a course