A client brief records what a room needs to do before you start choosing colours or moving furniture. Use this worksheet for a first room exercise, a conversation with a homeowner or a course project. It is a design discussion record, not a contract or construction specification.
The aim is to turn broad requests into decisions you can test. “Make the room modern” is a preference. “Provide two study places without blocking the balcony door” is a requirement that a layout can answer.
How to use this guide
Copy the tables into your notebook or working document. Discuss the questions with the person using the room. Keep uncertain information marked “to confirm,” and give each unresolved decision a responsible person and a review date. Revisit the brief after measurements and costs are checked.
1. Record the project basics
| Field | Your entry |
|---|---|
| Project or room name | Identify one room or a clearly defined area. |
| People using the space | Number of users, routines and relevant individual needs. |
| Person approving decisions | Name or role and preferred method of confirming choices. |
| Main problem | Describe what currently makes the room difficult to use. |
| Desired outcome | Write one sentence explaining what should improve. |
| Constraints | Existing items, access, tenancy restrictions and other known limits. |
Only record personal information needed for the project. Obtain permission before taking or sharing photographs of someone’s home. If the client rents, identify changes that need the owner’s approval before proposing permanent alterations.
2. Separate requirements from preferences
| Category | Questions to ask |
|---|---|
| Must have | Which activities must the space support? How many people use it together? |
| Would like | Which improvements matter if the budget allows? |
| Keep | Which furniture and finishes remain? What are their checked dimensions? |
| Avoid | Which colours, materials or arrangements have not worked? |
| Care and maintenance | How will the room be cleaned and maintained? |
| Individual needs | What access, comfort or usability needs should guide the proposal? |
Ask the client to rank the three most important outcomes. When priorities conflict, refer to that ranking rather than making assumptions on their behalf.
3. Clarify the budget and time assumptions
Record the intended spending limit and what it must cover. Does it include products only, or also delivery, preparation, installation and applicable taxes? Separate confirmed supplier prices from allowances. Ask whether the work has a genuine completion deadline or simply a preferred date.
Record who supplies each item and who coordinates installation. A furniture delivery date is not automatically a complete project programme. Availability, approvals and other work can affect when the room is ready.
4. Work through this example
Practice brief: Two adults share a small living room. One studies in the evenings. The sofa and floor tiles must remain. The main problem is that the temporary study table blocks a storage cupboard.
Design requirement: Test a layout that provides one study position, retains cupboard access and keeps the existing sofa. Preference: A calm colour direction with a limited number of new materials. To confirm: Room and furniture dimensions, power access, curtain measurements, supplier prices and permission for wall-mounted items.
This example does not prescribe a layout. It shows how the brief creates questions that measurement and design work must resolve.
5. End the discussion with a decision record
| Decision or question | Responsible person | Evidence needed | Review date |
|---|---|---|---|
| Example: retain existing sofa | Client and learner | Photograph and checked dimensions | Enter an agreed date |
| Example: approve curtain direction | Client | Physical sample and quotation | Enter an agreed date |
Read the brief back in plain language. Ask the client to correct anything you misunderstood. Save the agreed version and record later changes separately.
Use the brief in a room proposal
Pair this worksheet with a measured layout, mood board and basic shopping budget. Read the space-planning guide and mood-board guide for the next stages.
Ujenzi’s Interior Design Essentials course develops a first room proposal through guided work and exercises. Enquire about the course and confirm the next timetable.

