Skip to content
Ujenzi Training College

Practical skills for careers and entrepreneurship.

Category: Uncategorized

Interior Fit-Out Snagging and Handover Checklist for Beginners

Black design professional reviewing drawings and measurements on site

Organise a small interior fit-out review with a practical snagging checklist, issue log, responsibility tracker and handover document index.

Room Measurement Worksheet: A Beginner’s Interior Survey Guide

Architectural floor plan on a wooden desk beside measuring tools

Use this room measurement worksheet to record walls, openings, fixed features and existing furniture, with a checking routine before planning a room.

Interior Design Client Brief Template: A Practical Guide for Your First Room Project

Colour swatches, fabric and material samples arranged on a design desk

Use a practical interior design client brief template to record room users, priorities, existing furniture, budget assumptions and decisions before designing.

Interior Fit-Out Project Management: Planning Costs, Work Sequences and Handover

Black design professional reviewing drawings and measurements on site

Learn the basics of interior fit-out project management: define scope, organise budgets and procurement, coordinate work, record changes and plan handover.

AI for Interior Design: Creating Concepts Without Losing Design Accuracy

Black man with glasses working on a laptop at a desk

Use AI for interior design concepts while keeping room dimensions, material decisions, product checks and clear presentation labels under your control.

Interior Design Software Training in Nairobi: Preparing Your Laptop and Learning Workflow

Architectural drawings and drafting tools on a worktable

Prepare for interior design software training in Nairobi with confirmed software versions, laptop compatibility, licences, organised files and a backup plan.

ArchiCAD or SketchUp: Which Should an Interior Design Beginner Learn First?

Black man with glasses working on a laptop at a desk

Compare ArchiCAD and SketchUp for beginner interior design by the task you need to complete: room drawings, 3D models and clear design presentations.

How to Prepare a Basic Painting Quotation in Kenya

Paint brushes and a roller beside a wooden crate and paint tray

Prepare a clear painting quotation in Kenya with a defined scope, measured area, paint quantities, itemised costs, exclusions and approval terms.

Interior Paint Finishes Explained: Matt, Satin, Silk and Gloss

Close-up of a hand applying blue paint to a wall with a roller

Compare matt, satin, silk and gloss interior paint finishes by sheen, appearance and product suitability, and test samples before choosing.

Wall Preparation Before Painting: Why It Matters for the Finish

Paint roller and brushes on a ladder tray

Understand wall preparation before painting: assess the surface, resolve underlying problems, protect the room and follow a compatible coating system.

← Previous
Next →

Practical skills for careers and entrepreneurship.

All rights reserved